• Front on view

    Front on view

  • Metal bracing installed over bricks

    Metal bracing installed over bricks

  • More dramatic cable tray and cable

    More dramatic cable tray and cable

  • Cable and more cable...

    Cable and more cable...

  • Bund wall being built underneath furnace

    Bund wall being built underneath furnace

  • Big beast arrives to hoist furnace door!

    Big beast arrives to hoist furnace door!

  • Furnace door going in

    Furnace door going in

  • Tim installing cables underneath forehearth

    Tim installing cables underneath forehearth

  • Furnace fully braced

    Furnace fully braced

  • Glass charger hoisted for install

    Glass charger hoisted for install

  • Glass charger base unit going in

    Glass charger base unit going in

  • Just like Christmas, Kevin and Peter unwrapping the charger!

    Just like Christmas, Kevin and Peter unwrapping the charger!

  • Rear view of charger

    Rear view of charger

  • Side view of charger

    Side view of charger

  • Roger on tap detail

    Roger on tap detail

  • Water pipes underway

    Water pipes underway

  • Gas pipe ready for warm up

    Gas pipe ready for warm up

  • Tun dish and water pipe install

    Tun dish and water pipe install

  • Tun dish detail

    Tun dish detail

  • Preparing for firing up the furnace

    Preparing for firing up the furnace

RSS 2.0 Feed
HOME  |   Legal |  Contact